TIP Successfully Offloads and Ships Flowline Pipe
Thursday, November 17th, 2011In a project spanning over three days, Theodore Industrial Port successfully unloaded from barge, 324 pieces of FBE riser and flowline pipe and 317 pieces of GSPU flowline pipe. The pipe was unloaded and placed onto trucks to be delivered to Technip’s Mobile facility for Shell Oil Company.
Theodore Industrial Port continues to excel and deliver quality services to the Oil Filed and Pipeline Industries. Our facility has served as a Base of Operations for several oil filed clients and is used by these contractors to store and mobilize or demobilize project equipment to and from their Gulf of Mexico projects.